We have a brand new updated website! Click here to check it out!

Corps Wants Contractors to Hurry Up Repairs to Levee it Blew

 

Blowing the Birds Point Levee flooded 130,000 acres of Missouri to save Cairo, Illinois

The Corps of Engineers wants contractors to rebuild a levee it deliberately breached as quickly as possible. Senior Project Manager Dennis Abernathy says conditions for repairing the Birds Point Levee in southeast Missouri are almost ideal.

The Corps blasted three large holes in the levee last year to relieve flood pressure on Cairo, Illinois. The Mississippi River poured through the breaches and flooded 130,000 acres of southeast Missouri farmland. The Corps says rebuilding the levee will cost up to $20-million.

Copyright Eagle Radio | FCC Public Files | EEO Public File