ST. JOSEPH, Mo. – The following is a list of general highway maintenance and construction work the Missouri Department of Transportation has planned in the Northwest Missouri region for the week of May 18 – 24. Weather conditions may cause postponements in planned work schedules. Other construction or maintenance work may occur on other roadways throughout the area. Many projects will include lane closures and delays can be expected.
For more information about a project, please contact MoDOT at 1-888-ASK-MoDOT (888-275-6636) or visit www.modot.org/northwest/. You can also follow MoDOT’s Northwest Missouri District on Twitter @ModotNorthwest and on Facebook at www.facebook.com/MoDOTNWDistrict.
Andrew County
Interstate 29 – Northbound from mile marker 59 to mile marker 63 (Holt County); milling and resurfacing, May 18 – 23. Includes work on the driving lanes, entrance and exit ramps and a 16-foot width restriction.
Routes P and J – Pothole patching, May 21 – 22
Atchison County
Route W – CLOSED from Route J to Route 111; resurfacing project, May 19 – 21
Route OO – CLOSED from Route W to the end of state maintenance; resurfacing project, May 19 – 21
Route CC – Pothole patching, May 18 – 22
Various routes – Spraying, May 18 – 22
Route T – CLOSED from the Iowa state line to Route 275; resurfacing project, May 21 – 22
Buchanan County
I-229 – Sweeping and flushing bridges, May 18 – 21
Loop 29 – Belt Highway from County Line Road to Ashland Avenue; sidewalk project, May 18 – 22. Various lanes will be closed at different times, including lanes on side streets.
I-229 – From just after the St. Joseph Avenue on ramp to just before U.S. Hwy 36; bridge maintenance, May 18 – 22. (10-foot width restriction)
U.S. Hwy 59 – At the Bankers Crossing Bridge; new bridge construction, May 18 – 22
U.S. Hwy 36 – At the Platte River Bridge; bridge deck replacement, May 18 – 22. Traffic is head to head in the eastbound lanes with a 14-foot width restriction.
Route A – One-quarter mile north of Route H; driveway entrance repair and drainage work, May 18 – 22
Caldwell County
U.S. Hwy 36 – Spraying, May 18 – 22
Route U – From Route 13 to Route K; pothole patching, May 18 – 22
Carroll County
U.S. Hwy 24 – From DeWitt to the Chariton County line; pothole patching, May 18 – 19
Route E – From Route EE to County Road 211; drainage work, May 18 – 19
Route 10 – Pothole patching, May 20 – 22
Route D – From Route W to County Road 190; drainage work, May 21 – 22
Chariton County
Route 129 – Drainage work, May 18 – 22
U.S. Hwy 24 – At the Mid Fork Chariton River Bridge; bridge maintenance, May 18 – 22 (12-foot width restriction.)
Route 5 – At the Cottonwood Creek Bridge; bridge maintenance, May 18 – 22 (12-foot width restriction.)
U.S. Hwy 24 – At the Palmer Creek Bridge; bridge maintenance, May 18 – 22 (12-foot width restriction.)
U.S. Hwy 24 – At the Mussel Fork River Brige; bridge maintenance, May 18 – 22 (12-foot width restriction.)
Clinton County
Route PP – From I-35 to Moore Drive; pothole patching, May 19
Route Y – At County Road NW 348th; culvert repair, May 19
Route K – From Route NN to one mile north of Route NN; culvert repair, May 20
Route VV – From NW Fitzgerald Road to NW Maple Road; culvert repair, May 21
Daviess County
I-35, U.S. Hwy 69, Routes 6 and 190 – Pothole patching, May 18 – 22
U.S. Hwy 69, Routes 6, 13 and 190 – Brush cutting, May 18 – 22
U.S. Hwy 69, Routes B, C, K and V – Drainage work, May 18 – 22
Various routes – Spraying, May 18 – 22
DeKalb County
I-35 – From mile marker 51 to mile marker 48; brush cutting, May 18 – 21
U.S. Hwy 36 – Eastbound from the Cameron city limits to I-35; pavement repair, May 18 – 22 (14-foot width restriction.)
Gentry County
Various routes – Striping, May 18 – 19
U.S. Hwy 136 – Spraying, May 18 – 20
Route M and UU – Pothole patching, May 18 – 20
U.S. Hwy 136 – From Route C to Route H; shoulder work, May 18 – 22
U.S. Hwy 136 – In Stanberry; curb and gutter work, May 18 – 22
Routes E, H, AA, V, Z, BB, P and J – Spraying, May 18 – 22
Grundy County
U.S. Hwy 65 and Route 6 – Spraying, May 18 – 22
Route K – From U.S. Hwy 65 (Livingston County) to Route E; pothole patching, May 18 – 22
Routes A, NN and O – Drainage work, May 18 – 22
Routes N, NN, Z and E – Sign operations, May 18 – 22
Route 6 – From Route 146 to the Harrison County line; shoulder work, May 20 – 22
Harrison County
Route F – CLOSED at the Little Creek Bridge; bridge replacement. Closed through July 2015.
Route D – From Route M (Eagleville Road) to Route M (Washington Center); pothole patching, May 18 – 19
Route N – At the I-35 Bridge, bridge maintenance, May 18 – 20
Route M – From Route D to Route EE; pothole patching, May 20
Holt County
I-29 – CLOSED at U.S. Hwy 59 (Exit 75); bridge deck replacement. CLOSED through June 2015. Traffic is being rerouted to the on and off ramps. No access to U.S. Hwy 59 via Exit 75.
U.S. Hwy 59 – CLOSED at I-29; bridge deck replacement. Closed through June 2015. No access to I-29.
Route P – CLOSED from Route 118 to County Road 240; resurfacing project, May 18
U.S. Hwy 59 – From Mound City to Craig; drainage work, May 18 – 20
Route C – Pothole patching, May 18 – 20
Route D – Pothole patching, May 21 – 22
I-29 – Northbound from mile marker 59 (Andrew County) to mile marker 63; milling and resurfacing, May 18 – 23. Includes work on the driving lanes, entrance and exit ramps and a 16-foot width restriction.
Linn County
U.S. Hwy 36 – Spraying, May 18 – 20
Route HH – CLOSED one-half mile south of Route 129; culvert replacement, May 19, 7 a.m. to 3 p.m.
U.S. Hwy 36 – One-half mile east of Felton Road; pavement repair, May 20
Route C – CLOSED one mile east of Purdin; culvert replacement, May 20, 7 a.m. to 3 p.m.
U.S. Hwy 36 – From Route 130 to Route 139; pavement repair, May 21
Route MM – Drainage work, May 21
Livingston County
Route A – CLOSED from Route 190 to Route T; culvert replacement, May 18 – 8 a.m. to 11:30 a.m.
Route K – From U.S. Hwy 65 to Route E (Grundy County); pothole patching, May 18 – 22
Route F – CLOSED from Route C to the Carroll County line; culvert replacement, May 19, 8 a.m. to 11:30 a.m.
Route 139 – CLOSED from Route H to the Chariton County line; culvert replacement, May 20 – 21, 8 a.m. to 11:30 a.m. daily.
Route Z – CLOSED from U.S. Hwy 65 to Route C; culvert replacement, May 22, 8 a.m. to 11:30 a.m.
Mercer County
U.S. Hwy 136 – At the West Muddy Creek Bridge; bridge maintenance, May 18 – 22
U.S. Hwy 136 – Pothole patching, May 18 – 22
Route 139 – Pothole patching, May 18 – 22
Various routes – Sign operations, May 18 – 22
Nodaway County
Route 46 – CLOSED at the Big Slu Bridge; bridge maintenance, May 18 – 19, 7 a.m. to 3 p.m. (9-foot width restriction and may include overnight closure.)
Route A – At the Nodaway River Bridge; bridge maintenance, May 18 – 19
Route F and N – Pothole patching, May 18 – 22
Various routes – Spraying, May 18 – 22
Route VV – At the Platte River Bridge; bridge maintenance, May 20 – 22
Route J – Pothole patching, May 21 – 22
Putnam County
Routes FF, W, V and 149 – Pothole patching, May 18 – 22
Route 5 – Shoulder work, May 18 – 22
Routes 149, AA, W, N, O and F – Sign operations, May 18 – 22
Route W – Shoulder work, May 20
Sullivan County
Route C – CLOSED from Route CC to Elm Drive; culvert replacement, May 18, 8 a.m. to 3 p.m.
Routes MM, DD and Z – Pothole patching, May 18 – 22
Routes 5 and 6 – Mowing, May 18 – 22
Routes D, FF, H and 129 – Sign operations, May 18 – 22
Route O – CLOSED from East Line Street to Field Drive; culvert replacement, May 19, 8 a.m. to 3 p.m.
Route DD – CLOSED from Violet Road to Vermont Road; culvert replacement, May 20, 7 a.m. to 12 p.m.
Route DD – CLOSED from Route MM to Walnut Road; culvert replacement, May 20, 12 p.m. to 4 p.m.
Worth County
Various routes – Spraying, May 18 – 22
Various routes – Striping, May 20 – 21
Route PP – Pothole patching, May 21 – 22