
HUMBOLDT, Neb. (AP) — Work is scheduled to begin the week of June 13 on the Big Nemaha River bridge on the south edge of Humboldt.
The pavement and rail work will require detouring traffic off Nebraska Highway 105 onto Nebraska highways 4 and 8 and U.S. Highway 75.
The project is expected to be finished this fall.