We have a brand new updated website! Click here to check it out!

Roadwork for Northwest Missouri for July 6-12

wpid-wpid-modot-logo-200x150-200x150.jpg

ST. JOSEPH, Mo.  – The following is a listing of general highway maintenance and construction work in the Northwest Missouri region for the week of July 6 – 12, from the Missouri Department of Transportation. Many projects will include lane closures, and delays can be expected. MoDOT reminds the public to buckle up, slow down, and drive with extreme caution through work zones.

For more information about a project, please contact MoDOT at 1-888-ASK-MoDOT(888-275-6636) or visit www.modot.org/northwest/. You can also follow MoDOT’s Northwest Missouri District on Twitter @ModotNorthwest and on Facebook atwww.facebook.com/MoDOTNWDistrict.

Andrew County

  • Route Z – CLOSED from County Road 284 to County Road 264; culvert replacement, July 6, 7:30 a.m. to 3:30 p.m.
  • Interstate 29 – NIGHT WORK from U.S. Route 71 to Route O (Buchanan County); pavement repair, July 6 – 10, 6 p.m. to 6 a.m. Includes work on the driving lanes and a 15-foot width restriction.
  • U.S. Route 71 – Striping, July 6 – 9
  • Route DD – CLOSED from County Road 456 to County Road 372; culvert replacement, July 7, 8 a.m. to 3:30 p.m.

Atchison County

  • Route B – Pothole patching, July 6 – 8
  • Route D – Two miles north of U.S. Route 136; pothole patching, July 8
  • Route U – One mile north of Route E; pothole patching, July 9

Buchanan County

  • Routes C, Z, UU, 6 and 31 – Pothole patching, July 6 – 9
  • I-29NIGHT WORK from U.S. Route 71 (Andrew County) to Route O; pavement repair, July 6 – 10, 6 p.m. to 6 a.m. Includes work on the driving lanes and a 15-foot width restriction.
  • Business Loop 29 – Belt Highway from County Line Road to Ashland Avenue; sidewalk project, July 6 – 10. Various lanes will be closed at different times, including lanes on side streets.
  • I-229 – From just after the St. Joseph Avenue on ramp to just before U.S. Route 36; bridge maintenance, July 6 – 10 (10-foot width restriction)
  • U.S. Route 59 – At the Bankers Crossing Bridge; new bridge construction,July 6 – 10.  U.S. Route 59 will close to all traffic July 14 – August 14.
  • U.S. Route 36 – At the Platte River Bridge; bridge deck replacement, July 6 – 10. Traffic is head to head in the eastbound lanes with a 14-foot width restriction.
  • Routes 116 and Y – Mowing, July 6 – 10
  • Route 752 – At King Hill; signal work, July 7, 9 a.m. to 11 a.m.  Only the southbound turn lane will be closed.
  • U.S. Route 36 – At I-229; signal work, July 9, 9 a.m. to 11 a.m., Law enforcement will direct motorists through the work zone.

Caldwell County

  • Route U – CLOSED at NE Ironwood Drive; culvert replacement, July 6, 8 a.m. to 3 p.m. Access to NE Ironwood will be blocked during this time.
  • Route 116 – From the Caldwell County line to Route A; shoulder work, July 6

Carroll County

  • Route 139 – From Route J to U.S. Route 24; pothole patching, July 6 – 7
  • Various routes – Sign operations, July 6 – 10
  • Route WW – From U.S. Route 65 to Route YY; pothole patching, July 8
  • Route DD – From Route D to the Ray County line; pothole patching, July 9 – 10

Chariton County

  • Route KK – From U.S. Route 24 to Route WW; pothole patching, July 6 – 10
  • Routes F and Y – Pothole patching, July 6 – 10

Clinton County

  • I-35 – Southbound from mile marker 51 to mile marker 48; brush removal,July 6 – 7
  • Route A – CLOSED from the west city limits of Turney to 300-feet north; culvert replacement, July 7, 7 a.m. to 4 p.m.
  • Route Y – From Route 116 to Route NN; milling and culvert repair, July 7 – 10
  • Route NN – CLOSED from Route 33 to Route Y; culvert replacement, July 9, 7 a.m. to 4 p.m.

Daviess County

  • Route 13 – CLOSED at the Honey Creek Bridge; bridge maintenance, Closed thru July 24, 2015.
  • I-35, U.S. Route 69, Routes 6 and 190 – Pothole patching, July 6 – 10
  • U.S. Route 69, Routes DD, B and CC – Brush cutting, July 6 – 10
  • Route J – CLOSED one-half of a mile south of Route D; culvert replacement, July 8, 7 a.m. to 5 p.m.
  • Route ZZ – Pothole patching, July 9 – 10

DeKalb County

  • Route D – Drainage work, July 6 – 7
  • U.S. Route 36 – Westbound at the I-35 bridge; bridge maintenance, July 6 – 8 (12-foot width restriction.)
  • Route 31 – One-quarter mile south of Route V; driveway entrance repair, July 8
  • Route H – CLOSED from NW Berlin Road (Gentry County) to King Road; culvert replacement, July 8, 7:30 a.m. to 2:30 p.m.
  • U.S. Route 36 – Eastbound at the I-35 bridge; bridge maintenance, July 8 – 10 (12-foot width restriction.)
  • U.S. Route 36 – Eastbound near Bob Griffin Road in Cameron; drainage work, July 9

Gentry County

  • Route EE – Pothole patching, July 6 – 7
  • Route H – From Route E to U.S. Route 136; pothole patching, July 8
  • Route H – CLOSED from NW Berlin Road to King Road (DeKalb County); culvert replacement, July 8, 7:30 a.m. to 2:30 p.m.
  • Route M – CLOSED from County Road 452 to U.S. Route 169; culvert replacement, July 9, 7:30 a.m. to 2:30 p.m.
  • Route ZZ – Pothole patching, July 9 – 10
  • Route V – CLOSED from County Road 500 to Walker School Trail Road; culvert replacement, July 10, 7:30 a.m. to 2:30 p.m.
  • Route UU – From Route M to Route BB; sealing, July 10 – 11, 6 a.m. to 6 p.m.
  • Route UU Spur – From Route UU to the end of state maintenance; July 10 – 11, 6 a.m. to 6 p.m.

Grundy County

  • Routes M, JJ and W – Pothole patching and sealing, July 6 – 10
  • Routes Y and NN – Drainage work, July 6 – 10
  • Routes W, WW, 146 and 190 – Spraying, July 6 – 10

Harrison County

  • Route F – CLOSED at the Little Creek Bridge; bridge replacement.  Closed through July 2015.
  • Route B – From Route Y to Route A; pothole patching, July 6
  • Route N – From Route T to Route B; pothole patching, July 7
  • Route UU – Pothole patching, July 8
  • Route NN – Pothole patching, July 9 -10
  • Route T – From Route UU to the Iowa state line; pothole patching, July 9 – 10
  • Route ZZ – Pothole patching, July 9 – 10

Holt County

  • I-29 – CLOSED at U.S. Route 59 (Exit 75); bridge deck replacement. Closed through August 2015. Traffic is being rerouted to the on and off ramps. No access to U.S. Route 59 via Exit 75.
  • U.S. Route 59 – CLOSED at I-29; bridge deck replacement. Closed through August 2015. No access to I-29.
  • I-29 – From the city limits of Mound City to the city limits of Corning; pothole patching, July 6 – 10
  • U.S. Route 59 – From the Oregon city limits to I-29; pavement repair, July 6 – 10

Linn County

  • Routes DD, Y, V and CC – Pothole patching, July 6 – 9
  • Route 129 – In the Bucklin city limits; drainage work, July 7

Livingston County

  • U.S. Route 65 – From U.S. Route 36 to Route Z; pavement repair, July 6 – 7
  • Route 139 – From Route H to the Carroll County line; July 6 – 9
  • Routes A and W – Pothole patching, and sealing, July 6 – 10
  • U.S. Route 36 – From Route C to Route B; pavement repair, July 8 – 9

Mercer County

  • Route C – Pothole patching, July 6 – 10
  • Routes B, N, V, WW and 145 – Mowing, July 6 – 10
  • Various routes – Sign operations, July 6 – 10

Nodaway County

  • U.S. Route 136 – From U.S. Route 71 to Route 46; milling, July 6 – 7
  • U.S. Route 71 – Striping, July 6 – 9
  • Route C – At the Nodaway River Bridge; bridge maintenance, July 6 – 10
  • Various routes – Pothole patching, July 6 – 10
  • Route 148 – Milling, July 8 – 9
  • Route NN – At the Platte River Bridge; bridge maintenance, July 9 – 10 ( 9-foot width restriction.)

Putnam County

  • Route 5 – From U.S. Route 136 to the Iowa state line; shoulder work, July 6 – 7
  • U.S. Route 136 and Route 5 – Spraying and drainage work, July 6 – 10
  • Routes A, C, N, Z, DD and NN – Mowing, July 6 – 10
  • Routes E, NN and 139 – Pothole patching, July 8 – 10

Sullivan County

  • Route N – CLOSED at the Little Yellow Creek Bridge; bridge maintenance,July 6, 7 a.m. to 3 p.m.
  • Route M – CLOSED from Route 129 to Route B; culvert replacement, July 6, 7 a.m. to 3 p.m.
  • Route 6 – CLOSED at Field Drive between Route 6 and Route Y; culvert replacement, July 6 – 8, 7 a.m. to 3 p.m. daily (Access to Field Drive will be closed at both Route 6 and Route Y during the above hours.)
  • Route N – At the East Locust Creek Bridge; bridge maintenance, July 7 – 8
  • Route 129 – CLOSED from Wagon Road to Vannoy Road; culvert replacement, July 9, 7 a.m. to 3 p.m.
  • Route BB – CLOSED at Rooks Bridge; bridge maintenance, July 9, 7 a.m. to 3 p.m.

Worth County

  • Route B – Pothole patching, July 6 – 7
  • Route Y – Pothole patching, July 8
  • Route H – From Route 246 to the Iowa state line; chip sealing, July 9, 6 a.m. to 6 p.m.

 

Copyright Eagle Radio | FCC Public Files | EEO Public File